Below are pictures from 2013 as work continues on the grounds of the Camp Facilities.
Volleyball Court
Preparation for sidewalks to be poured.
Above and below : New Front Door was put up in 2013.
Picture below is of the Office
Pavilion
Pavilion after completed.
This pictures shows the bathrooms in the pavilion and the concrete slab
which was poured in front of them..
No comments:
Post a Comment