Thursday, August 24, 2017

Summer Work in 2013

Below are pictures from 2013 as work continues on the grounds of the Camp Facilities.



                                                   Buddy working on building Fire Pit

                                                                 Volleyball Court

                                              Preparation for sidewalks to be poured.


                                 
                                     Above and below : New Front Door was put up in 2013.

                                             
                                                       Picture below is of the Office
                                                                            Pavilion

                                                                  Pavilion after completed.

This pictures shows the bathrooms in the pavilion and the concrete slab 
which was poured in front of them..

No comments:

Post a Comment