Pictures of house moved to property.

House as it was delivered to 3010 Fletcher Smith Rd.
Pictures of the actual moving are on a previous post.

This is work on the driveway pipe as it was being installed.
Front of building after it was set up and leveled.
Back of building before porch was added.
This is after the front porch was built.  We had a work day on Feb. 25, and about 15 volunteers showed up and helped build the porch.  Also OSB was put up and the vinyl siding was started on the side.  We are grateful for all who had a part in the work that was accomplished.